Manhole Repaired/Refurb

Project Details Residential Manhole Repair and refurbishment to assist in rodent proofing. Client Private Residential Client Our Role Manhole repaired and refurbished Contractor N/a Delivery Date 2022 Project Summery Use of Speedylight system by our technical engineers. Marlie’s team visited the site to do some on site training.The Sewertronics Speedylight System is fast becoming the […]

Manhole Refurbishment

Project Details Full manhole refurb and investigation Client Residential Our Role Manhole refurbishment Delivery Date 2022 Project Summery After a survey of the property had been carried out for the home buyer the manhole required a full refurb. A civils crew then attended the property to carry out the worksThe flow was then restored allowing […]

2M Patch Repair

Project Details Patch Repair with Resin Client Residential Our Role Locate Issue & Repair Delivery Date 2022 Project Summery Marlie drainage engineers attended site and carried out a site survey to access and locate the defects. Once the defect had been located to repair crew were then able to select the correct materials and method […]

Sanders Park

Project Details Replace a storm drain with a vole friendly alternative Client Worcestershire Wild Life Trust, Council Bromsgrove District Our Role Storm Drain Replacement Contractor Severn Trent Water Delivery Date 2017 Project Summery In the of Spring 2017, Marlie, Worcestershire Wild Life Trust, Bromsgrove District Council and Severn Trent Water joined forces to create a […]